PRODUCTS & TECHNOLOGY

Products & Technology

Why capability areas rather than brands

The same requirement can usually be met by several combinations. Virtualisation consolidation can run on hyperconvergence, or on servers plus shared storage plus a virtualisation platform. Campus networking can be replaced end to end, or only at the core with existing aggregation reused. Fixing the capability area first keeps the solution serving the requirement.

Every area page therefore answers the same four questions: which problem it solves, when it is the wrong choice, how far our delivery goes, and what is explicitly out of scope. A page that answers all four has judgement value; one that lists models does not.

Specifications are not reproduced here. Model-level parameters change by batch and go stale; we provide a comparison table with source and retrieval date during selection. Stale parameters on a website mislead more than missing ones.

Six capability areas

Computing

Rack, blade, high-density and GPU servers, sized by workload rather than model.

Learn more →

Storage

All-flash, hybrid, distributed, backup and DR, designed around usable capacity and recovery targets.

Learn more →

Networking

Data centre, campus and WAN, including upgrades that reuse existing equipment.

Security

Perimeter, application, data and cloud security, aligned with Chinese compliance requirements.

Cloud & virtualisation

Virtualisation platforms, hyperconvergence and VDI, including migration assessment.

Operations

Monitoring, inspection, spares and remote support, turning equipment into a managed service.

What every area page states

ItemIncluded
The problem it solvesApplicable and non-applicable scenarios, with reasoning rather than conclusions
Data we collectCurrent load, growth curve, availability target, budget and time window
How far we deliverConfiguration check, goods receipt, racking, firmware baseline, monitoring, acceptance
What is out of scopeApplication changes, data governance, room construction and cabling, quoted separately

From requirement to delivery

01

Requirement and current state

Load profile, capacity levels, topology and twelve months of incident records to locate the bottleneck.

02

Options and comparison

At least two combinations across brands or architectures, with the source of the price difference explained.

03

Compatibility check

RAID controllers, optics, virtualisation versions, licensing and warranty continuity.

04

Delivery and racking

Goods receipt, racking and cabling, firmware baseline, OS and virtualisation installation.

05

Monitoring and acceptance

Monitoring onboarding, alert thresholds, acceptance tests and documentation handover.

Scope and boundaries

Why are models and prices not listed?

Model availability and lead times change quickly, and a price written on a page is usually wrong within two weeks. We issue a current comparison table with a stated validity period and configuration baseline.

Can we buy hardware without implementation services?

Yes. Supply-only is delivered against a configuration list, with acceptance based on unpacking inspection and configuration verification. Racking, migration and tuning are separate line items.

What about equipment outside these six areas?

Our own capability covers these six. Room air conditioning, UPS, structured cabling and AV can be coordinated through suppliers, but are not offered as our own delivery commitment.

Not sure which area to start with?

Describe the current state and constraints; we will identify the layer where the bottleneck sits before touching equipment.

Request a quote